Resource Allocation Practices and Implementation of National Government Development Projects in Kiambu County, Kenya
Abstract
National government projects in Kenya are often delayed, scaled down or left unfinished. Resource allocation, meaning how adequate, timely and efficiently used financial, human and material resources are, is commonly blamed, but its separate influence on projects in Kiambu County has not been tested. This study determined the influence of resource allocation practices on the implementation of national government development projects in Kiambu County. It was guided by the Resource-Based View. A descriptive correlational design targeted 120 project managers, engineers, monitoring and evaluation officers and finance officers who worked on projects completed between 2020 and 2025. Yamane’s formula gave a sample of 92, drawn through stratified random sampling, and 86 usable questionnaires were returned (93.5%). The questionnaire combined five-point Likert items with open-ended questions. Data were analysed in SPSS using descriptive statistics, Pearson correlation and simple linear regression, and open-ended answers were coded thematically. The instrument was reliable (resource allocation α = .891; project implementation α = .846). Respondents rated resource allocation moderately well (mean = 3.67), with the adequacy of finance weakest (57.0% agreement). Resource allocation correlated strongly with project implementation (r = .628, p < .001) and explained 39.5% of its variance (R² = .395; F(1, 84) = 54.786, p < .001; B = .489). The relationship held after controlling for planning, leadership, and monitoring and evaluation (β = .391, p < .001). Delayed funding was the challenge cited most often (25.6%). The design is cross-sectional and perceptual, so the results show association and not causation. The study recommends predictable fund release schedules, early tracking of disbursements, faster procurement and independent verification of resource data.
Keywords: Resource allocation, project implementation, national government projects, Resource-Based View, Kiambu County, Kenya.
References
Atkinson, R. (1999). Project management: Cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteria. International Journal of Project Management, 17(6), 337-342.
Babbie, E. (2021). The practice of social research (15th ed.). Cengage Learning.
Barney, J. (1991). Firm resources and sustained competitive advantage. Journal of Management, 17(1), 99-120.
Belassi, W., & Tukel, O. I. (1996). A new framework for determining critical success/failure factors in projects. International Journal of Project Management, 14(3), 141-151.
Braun, V., & Clarke, V. (2006). Using thematic analysis in psychology. Qualitative Research in Psychology, 3(2), 77-101.
Breusch, T. S., & Pagan, A. R. (1979). A simple test for heteroscedasticity and random coefficient variation. Econometrica, 47(5), 1287-1294.
Bryson, J. M., Ackermann, F., & Eden, C. (2007). Putting the resource-based view of strategy and distinctive competencies to work in public organizations. Public Administration Review, 67(4), 702-717.
Chepgimis, M. C., Muchelule, Y., & Were, S. (2026). Project planning practices and implementation of National Government Constituency Development Funded projects in Kiambu County, Kenya. Journal of Entrepreneurship & Project Management, 10(1), 131-145. https://doi.org/10.53819/81018102t3173
Cohen, J. (1988). Statistical power analysis for the behavioral sciences (2nd ed.). Lawrence Erlbaum Associates.
Cooper, D. R., & Schindler, P. S. (2014). Business research methods (12th ed.). McGraw-Hill Education.
Dess, G. G., & Robinson, R. B. (1984). Measuring organizational performance in the absence of objective measures: The case of the privately held firm and conglomerate business unit. Strategic Management Journal, 5(3), 265-273.
Durbin, J., & Watson, G. S. (1951). Testing for serial correlation in least squares regression. II. Biometrika, 38(1-2), 159-178.
Engwall, M., & Jerbrant, A. (2003). The resource allocation syndrome: The prime challenge of multi-project management? International Journal of Project Management, 21(6), 403-409.
Flyvbjerg, B. (2014). What you should know about megaprojects and why: An overview. Project Management Journal, 45(2), 6-19.
Hair, J. F., Black, W. C., Babin, B. J., & Anderson, R. E. (2019). Multivariate data analysis (8th ed.). Cengage Learning.
Ika, L. A. (2009). Project success as a topic in project management journals. Project Management Journal, 40(4), 6-19.
Joslin, R., & Müller, R. (2016). The relationship between project governance and project success. International Journal of Project Management, 34(4), 613-626.
Kaiser, H. F. (1974). An index of factorial simplicity. Psychometrika, 39(1), 31-36.
Kaliba, C., Muya, M., & Mumba, K. (2009). Cost escalation and schedule delays in road construction projects in Zambia. International Journal of Project Management, 27(5), 522-531.
Kamau, S., Gesimba, P. O., & Gichuhi, D. (2022). Cost control and realization of national government constituencies development fund projects in Kikuyu constituency, Kiambu county, Kenya. International Journal of Research in Business & Social Science, 11(7).
Kibagendi, J. A., & Sang, P. (2024). Resource allocation and performance of housing construction project in Kiambu County, Kenya. The Strategic Journal of Business & Change Management, 11(4), 1108-1120. http://dx.doi.org/10.61426/sjbcm.v11i4.3145
Kraaijenbrink, J., Spender, J. C., & Groen, A. J. (2010). The resource-based view: A review and assessment of its critiques. Journal of Management, 36(1), 349-372. https://doi.org/10.1177/0149206309350775
Mugenda, O. M., & Mugenda, A. G. (2003). Research methods: Quantitative and qualitative approaches. ACTS Press.
Musawir, A. ul, Abd-Karim, S. B., & Mohd-Danuri, M. S. (2020). Project governance and its role in enabling organizational strategy implementation: A systematic literature review. International Journal of Project Management, 38(1), 1-16. https://doi.org/10.1016/j.ijproman.2019.09.007
Nunnally, J. C., & Bernstein, I. H. (1994). Psychometric theory (3rd ed.). McGraw-Hill.
Nyanduku, F. K., & Kyalo, J. (2023). An investigation of project management practices on sustainability of selected road projects in Kiambu County, Kenya. The Strategic Journal of Business & Change Management, 10(4). http://dx.doi.org/10.61426/sjbcm.v10i4.2785
Penrose, E. T. (1959). The theory of the growth of the firm. Basil Blackwell.
Pfeffer, J., & Salancik, G. R. (1978). The external control of organizations: A resource dependence perspective. Harper & Row.
Pinto, J. K., & Slevin, D. P. (1987). Critical factors in successful project implementation. IEEE Transactions on Engineering Management, EM-34(1), 22-27.
Podsakoff, P. M., MacKenzie, S. B., Lee, J.-Y., & Podsakoff, N. P. (2003). Common method biases in behavioral research: A critical review of the literature and recommended remedies. Journal of Applied Psychology, 88(5), 879-903.
Priem, R. L., & Butler, J. E. (2001). Is the resource-based view a useful perspective for strategic management research? Academy of Management Review, 26(1), 22-40. https://doi.org/10.5465/amr.2001.4011928
Republic of Kenya. (2010). The Constitution of Kenya, 2010. National Council for Law Reporting.
Republic of Kenya. (2012). Public Finance Management Act, 2012 (No. 18 of 2012). National Council for Law Reporting.
Republic of Kenya. (2015). Public Procurement and Asset Disposal Act, 2015 (No. 33 of 2015). National Council for Law Reporting.
Saunders, M., Lewis, P., & Thornhill, A. (2019). Research methods for business students (8th ed.). Pearson Education.
Shapiro, S. S., & Wilk, M. B. (1965). An analysis of variance test for normality (complete samples). Biometrika, 52(3-4), 591-611.
Shenhar, A. J., Dvir, D., Levy, O., & Maltz, A. C. (2001). Project success: A multidimensional strategic concept. Long Range Planning, 34(6), 699-725.
Tavakol, M., & Dennick, R. (2011). Making sense of Cronbach’s alpha. International Journal of Medical Education, 2, 53-55.
Teece, D. J., Pisano, G., & Shuen, A. (1997). Dynamic capabilities and strategic management. Strategic Management Journal, 18(7), 509-533.
Too, E. G., & Weaver, P. (2014). The management of project management: A conceptual framework for project governance. International Journal of Project Management, 32(8), 1382-1394. https://doi.org/10.1016/j.ijproman.2013.07.006
Wall, T. D., Michie, J., Patterson, M., Wood, S. J., Sheehan, M., Clegg, C. W., & West, M. (2004). On the validity of subjective measures of company performance. Personnel Psychology, 57(1), 95-118.
Wanjiru, M. G., & Mwanzia, M. (2026). Strategic management practices influencing implementation of road maintenance projects in Kiambu County, Kenya. Journal of Business and Strategic Management, 11(5), 69-90. https://doi.org/10.47941/jbsm.3846
Wernerfelt, B. (1984). A resource-based view of the firm. Strategic Management Journal, 5(2), 171-180.
Yamane, T. (1967). Statistics: An introductory analysis (2nd ed.). Harper & Row.